Bitcoin Mining Data Centers,
Built for You in the UAE
We find the land, secure the approvals, build the electrical infrastructure and hand over a working facility — cooled by air, hydro or immersion. BitHash has built mining facilities in the UAE for over 5 years, and operates 10 of our own.
5+
years building mining infrastructure in the UAE
10
hosting centres we operate ourselves
100+
MW of deployable power capacity
3
cooling types: air, hydro and immersion
Land Sourcing & Title
Securing industrial plots with dedicated utility easements and direct proximity to transmission corridors.
Sovereign Permitting
End-to-end municipal approvals, civil defense clearances, environmental permits, and utility NOCs.
Electrical Engineering
High-voltage lines, dedicated substations, custom transformer skids, and precision busway distribution.
Engineered Cooling
Air containment, closed-loop hydro loops, or immersion fluid tanks optimized for 55°C Gulf summers.
Recent Builds
Purpose-built mining sites delivered in the UAE
Real infrastructure projects — from raw land to running halls. Each built with dedicated power lines and custom cooling configurations.

Al Quoz Heavy Industrial Mining Facility
Complete greenfield site build featuring 15 kilometers of dedicated high-voltage lines, 40,000 square meters of secure compound, and custom hydro containment halls.
6 MVA
40,000 m²
15 km Pulled
7 Months Total

Jebel Ali Multi-Megawatt Hydro Expansion
Expanding institutional mining capacity with 8 kilometers of underground cabling, dedicated medium-voltage switchgear, and modular closed-loop dry cooler integration.
6 MVA
8 km Trench
Hydro Closed-Loop
6 Months
Built on our own operational experience
BitHash operates 10 hosting centres across the UAE — 5 hydro-cooled and 5 air-cooled. Every datacenter we construct for clients benefits from the engineering practices refined across our own fleet. We don't just build — we run what we build.
Cooling
Air, hydro or immersion
We build all three. Which one fits depends on the machines you will run, your budget and the site.
Hydro-Cooled Infrastructure
Closed-loop liquid manifolds & external dry coolers
- Cooling Architecture
- Closed-Loop Primary Loop + Adiabatic Dry Coolers
- PUE Rating
- 1.03 – 1.05
- Supported Machines
- Antminer S21/S19 Hydro, Whatsminer M53/M63 Hydro
- Target Construction
- 90 – 110 Days from Groundbreak
Every build is priced per project. Cost depends on land, distance to the nearest substation, and your cooling choice.
Best for
Institutional mining fleets deploying Antminer Hydro (S21/S19 Hydro) or Whatsminer (M53/M63) for 100% summer uptime.
Engineering Features & Inclusions
- Sub-1.05 PUE thermal efficiency in 52°C UAE ambient temperatures
- Stainless steel hydraulic quick-disconnect manifolds (DN25/DN32)
- Over 2.5x more hashpower per square meter of hall space
- Direct-to-chip heat extraction eliminates high-RPM fan noise (< 45 dB)
Considerations before selecting
- Requires certified deionized dielectric glycol closed fluid loops
- Requires miners with factory cold plates or converted water blocks
Thermal Engineering Benchmark
Cooling Stack Comparison in Gulf Ambient Temperatures
How our engineered cooling architectures perform under peak UAE desert heat conditions up to 55°C.
| Metric | Air-Cooled | Hydro-Cooled | Immersion | Advantage |
|---|---|---|---|---|
| Power Usage Effectiveness (PUE) | 1.25 – 1.45 PUE | 1.03 – 1.05 PUE | 1.02 – 1.04 PUE | Up to 25% lower auxiliary power |
| Gulf Summer Heat Tolerance | Thermal throttling > 42°C | Full speed up to 55°C | Full speed up to 55°C | Zero summer hash degradation |
| Noise Envelope | 75 – 85 dB (High decibel) | < 45 dB (Whisper quiet) | < 40 dB (Silent) | Municipal noise code compliance |
| Desert Sand & Dust Protection | Heavy intake filtration needed | Sealed cold-plate circuit | 100% dielectric immersion | Zero particulate damage |
| Relative Construction CapEx | Lowest Initial CapEx | Moderate / High Density | Higher CapEx / Max Density | Scalable to budget & machines |
How a Build Works
From a plot of land to a hashing facility
One team handles every step — you deal with one company from land acquisition to hand-over.
Site Selection & Land
We identify plots optimized for power access and secure them on lease or purchase. Already have land? We build on yours.
Permits & Approvals
We handle all regulatory paperwork — government permits, building codes, environmental approvals — and manage them through to completion.
Electrical Infrastructure
We build the entire power backbone: grid connections, high-voltage lines, transformers, switchgear, and distribution to every rack position.
Cooling & Hall Construction
The facility is engineered around your chosen cooling — air-cooled halls, hydro container pods, or immersion tanks — sized for the machines you will run.
Commissioning & Handover
We energize the site, stress-test under full load, and hand over a running facility. Prefer us to operate it? Ask about our managed operations service.
Turnkey hydro deployment in a converted facility
A complete hydro mining build for a client — water-cooled racks, pump skid, manifold plumbing, and SCADA monitoring — handed over ready to mine.
- Miner racks on water circuits
- Pump skid and expansion tank
- Control panel and live SCADA monitoring
Deployment Scope
Private Residential Hydro Pod
We Run What We Build
Our own data centers are the reference
BitHash operates 10 hosting centres in the UAE — 5 hydro-cooled and 5 air-cooled. This is what we do every day. Tour a site before you commit.
FAQ
Questions
Tell us what you want to build
Send us the power you need, your preferred cooling, and the location. We'll come back with a plan and a quote.