Power Upgradation Services · UAE

Scale Your Data Center's
Power Capacity in the UAE

We handle the entire process of increasing electrical power capacity for your plot or data centre in the UAE — from utility feasibility and authority approvals to civil substation construction, transformer installation, and final energization.

1 – 100+ MVA

Scalable Upgrade Capacity

100% Turnkey

Approvals to Energization

DEWA & Etihad WE

Utility Regulatory Sign-off

5+ Years

UAE Power Engineering

Consultation & Load Study

Comprehensive analysis of existing distribution boards, feeder lines, and site capability against local utility substation headroom.

Regulatory Approvals

Full management of DEWA, ADDC, Etihad WE, and civil defense approvals, load sanction letters, and utility interconnection agreements.

Heavy Electrical Infrastructure

Procurement, delivery, and installation of oil-immersed transformers, SF6 gas-insulated switchgear (GIS), and high-voltage underground cabling.

Testing & Live Energization

Secondary injection testing, protection relay coordination, infrared thermography, and utility-witnessed energization under full load.

Capacity Scopes

Power Upgrade Configurations

Select the engineering scope that aligns with your computing expansion, fleet density, and site specifications.

Most Popular

Dedicated Medium-Voltage Substation

Custom 6 MVA to 20 MVA on-plot substation construction

Capacity Band
6 MVA to 20 MVA Scalable
Primary Voltage
11 kV or 33 kV Medium Voltage
Transformer Type
Hermetically Sealed Oil-Immersed / Cast Resin Dry Type
Safety Standard
UAE Fire & Life Safety Code + Civil Defense Certified

Timeline benchmark: 90 – 150 Days from contract execution to live utility energization.

Best for

Commercial plots, mining compounds, and data center developments requiring independent, dedicated power delivery.

Engineering Deliverables & Scope

  • Dedicated civil substation structure built strictly to municipal utility standards
  • Dual-redundant transformer bays for N+1 operational reliability
  • Custom medium-voltage switchgear room with SCADA telemetry and trip protection
  • Complete cable trenching, earthing grid, and lightning protection system

Considerations before selecting

  • Requires dedicated plot area for substation building and utility vehicle access
  • Requires utility security deposits and network connection charges (calculated per kVA)

Engineering Progression

How It Works

Our streamlined 5-step engineering process ensures a predictable, hassle-free power upgrade from initial audit to live switch-on.

01

Consultation & Assessment

We start by analyzing your computing power requirements and assessing your current infrastructure capability. Our electrical engineers survey the plot, check substation proximity, and evaluate grid load feasibility.

02

Contract & Engineering Proposal

Following the assessment, we produce a comprehensive engineering proposal and contract. This details the exact scope of civil works, single-line diagrams (SLD), equipment specifications, guaranteed timelines, and transparent cost benchmarks.

03

Regulatory Approvals & NOCs

BitHash takes full legal responsibility for securing all mandatory approvals from local authorities and utility providers (DEWA, ADDC, Etihad WE, Civil Defense). We navigate the bureaucracy and paperwork so you don't have to.

04

Infrastructure Upgrade & Civil Works

Our technical crews execute the infrastructure upgrades: transformer installation, medium-voltage switchgear rigging, cable trenching, busbar installation, and protection relay wiring strictly meeting UAE safety standards.

05

Testing, Commissioning & Energization

The final milestone is energization. We coordinate with the utility provider to conduct secondary injection tests, insulation resistance checks, and switch on the power under monitored load conditions.

Track Record · UAE Power Delivery

Proven Grid Delivery Across the Emirates

Our engineering team has delivered over 15 kilometers of pulled high-voltage lines, constructed dedicated 6 MVA substations, and interconnected heavy mining arrays into the UAE power grid.

Cabling Deployed

15+ km

Underground HV feeders pulled

Energization SLA

100%

First-time authority sign-off

DEWA & Etihad WE Certified

Need More Power for Your Site?

Provide your plot location and target megawatt load. Our team verifies substation capacity within 48 hours.

Target Power1 MVA to 100 MVA
JurisdictionAll 7 UAE Emirates
Audit FeeWaived with Contract
Request Feasibility Audit

FAQ

Frequently Asked Questions

Standard pad-mounted transformer additions (1–5 MVA) with existing grid headroom are typically completed and energized within 60 to 90 days. Dedicated 6–20 MVA substations requiring civil building construction take between 90 and 150 days. High-voltage transmission connections (20–100+ MVA) take 5 to 8 months depending on right-of-way routing.

Ready to Upgrade Your Power?

Contact our UAE electrical engineering desk today to review your plot specs, assess grid headroom, and receive a detailed power upgradation proposal.